Highport Helm – July 8, 2016

Uncategorized

Greetings Highport Members,

Please take the time to read about our latest updates, events and this week’s featured slip!

Thanks for Celebrating Independence Day at Highport!

We had such a great time last weekend with DJ Magnum from Hot 107.3, the Chinatown Band, Little Big Iron, Rocky and the Bullwinkles, and Charlie Duhon the Solo Steel Drummer! And, of course, with you – our Highport family! Thank you for coming out to Highport on beautiful Lake Texoma to celebrate.

independenceday

Featured Slip: C-18 Docko

This docko not only has a fabulous location and view, but also tons of premium amenities, including:

  • 50×18 improved slip & docko
  • 6,000 lb HydroHoist
  • New water heater
  • Recently serviced AC
  • Upgraded refrigerator
  • New dishwasher
  • New faucets
  • Couch, chairs, kitchen table, beds and side tables
  • All appliances
  • Lower deck furniture, refrigerator and storage cabinet

View the full listing here: C-18 Docko

c18docko1
c18docko2

For pricing information or to make an appointment, call Di Jourden
Office: 903-462-0721
Cell: 903-814-2107
djourden@highport.com

SAFETY TIPS

Repel Snakes with Mothballs and Cat Litter

Got snake problems? Mothballs are a natural snake repellent! Grab some cat litter and mothballs and mix them together before heading back to your slip. You can sprinkle the mixture around the perimeter of your slip, or keep the mixture in a closed container and leave it inside your docko for two days.


mothballs

This technique works due to the naphthalene ingredient the mothballs contain. In fact, this ingredient is frequently used in many commercial remedies. It irritates the creatures’ chemical receptors.

Moth balls can also be hazardous to pets and domestic animals. While using, keep them away from children. Also, remember to wear gloves and a respiratory mask when making your mothball and cat-litter mixture.

Learn more about effective snake repellents at pestkill.org

IMPROVEMENTS UPDATE

This Week’s Improvements

The Breakwater project is moving along well – this $1.5 million project is approximately 20% complete! Protecting your boats is important to us, so for those of you who are at Highport this week, please be on the lookout for the breakwater crew and their continued progress at the entrance to the harbor. Please be extra careful when entering and exiting the harbor while the installation continues.

waterproject

Remember, we are still hiring for both full-time and part-time positions. Bring your resume to 120 Texoma Harbor Dr. Pottsboro, TX 75076 or apply online.

hiring